Avista Little Falls Dam

Wagstaff AT is manufacturing three sets of new wicket gates, along with distributor disks, for the Little Falls Dam in Post Falls, Idaho.

Read More

Avista Nine Mile Unit 4

The Avista Nine Mile Unit 4 project involved rehabilitation of many turbine related components.

Read More

Avista Noxon Rapids HED Units 2 and 4

The Avista Noxon Rapids Unit 2 and 4 projects involved refurbishment of existing components and manufacture of new components. Both projects were successfully completed on time.

Read More

Idaho Falls Power Old Lower Powerhouse

The Idaho Falls Power Old Lower Powerhouse project included refurbishment of the component for two Kaplan turbine hydropower generators.

Read More

Lake Creek Valve Repair

Wagstaff AT performed machining of the valve seat and valve gate on this project.

Read More

Yelm HED Unit 2

These projects involved design and fabrication of multiple turbine components for Units 2 and 3.

Read More

Wagstaff Applied Technologies
3910 North Flora Road
Spokane Valley, WA 99216 USA
Phone: 1(509) 922-1404
Fax: 1(509) 924-0241

Contact Dan Payne dan.payne@wagstaff.com

Privacy Policy

Copyright © 2024 Wagstaff Applied Technologies Inc. All rights reserved.
top